Executive Dashboard

Real-time laboratory quality signals across every department.

Live · Demo data
Filters
QC Pass Rate (30d)
81.3%
976 of 1,200 results
Warnings
116
3 pending review
Rejections
105
5 open critical alerts
Mean CV%
4.32%
9 instruments · 40 QC lots
Daily pass rate — trailing 14 days
Predictive early-warning

Decision support signals. Not a diagnostic result — always review clinically.

Early-warning: possible drift on Prothrombin Time
Mean shift of 1.65 SD over the trailing window. Decision-support signal only.
  • Reagent approaching end of stability
  • Calibration expiring in the next 72 hours
  • Environmental temperature trending upward
Early-warning: possible drift on Latex Agglutination Control
Mean shift of 1.60 SD over the trailing window. Decision-support signal only.
  • Reagent approaching end of stability
  • Calibration expiring in the next 72 hours
  • Environmental temperature trending upward
Early-warning: possible drift on Thyroid Stimulating Hormone
Mean shift of 1.48 SD over the trailing window. Decision-support signal only.
  • Reagent approaching end of stability
  • Calibration expiring in the next 72 hours
  • Environmental temperature trending upward
Open critical alerts
All alerts
Alanine Aminotransferase failed QC (L2)
Violations: shift, 10x on ALT
Rejected
Hemoglobin failed QC (L1)
Violations: shift, 10x on HGB
Rejected
Hemoglobin failed QC (L2)
Violations: 1-3s, 2-2s, 4-1s, shift, 10x on HGB
Rejected
Platelets failed QC (L1)
Violations: 4-1s, shift on PLT
Rejected
MIC Ceftriaxone Control failed QC (L1)
Violations: 1-3s, shift, 10x on MIC-CTX
Rejected
Open corrective actions
Workflow
openDue 9/29/2026
Alanine Aminotransferase failed QC (L2)
Assignee: K. Rivera
in progressDue 9/28/2026
Hemoglobin failed QC (L1)
Assignee: L. Fischer
pending approvalDue 9/27/2026
Hemoglobin failed QC (L2)
Assignee: P. Nakamura
closedDue 9/26/2026
Platelets failed QC (L1)
Assignee: S. Ahmed